
Add to Cart
Sintering Furnace, Sinter HIP Furnace, Industrial Vacuum Furnace, Atmosphere Furnace
Base on years’ experience in tungsten carbide producing, we offers sintering furnace to also competitors and sell sintering furnace in the market, starting from sintering furnace in sintering cemented carbide products, then expended to MIM(Metal Injection Moulding) industry, gold sintering, cermet sintering(metal-ceramic) etc.
Classified by the working pressure inside the furnace, there are vacuum sintering furnace and pressure sintering furnace.
Vacuum sintering furnace sinter products inside without any pressure. In most conditions, graphite is used for the heating and loading box, but in some conditions, the molybdenum shield is used.
Pressure sintering furnace/ Sinter HIP furnace
Sintering in pressure can make the product structure more density, can avoid air hole inside sintered products. Hence pressure sintering is applied in many industries, especially in the cemented carbide industry, vacuum sintering furnace is replaced or is going to be replaced by pressure furnace.
Top class level main components in the world are applied to our sintering furnace, as below list
Item | Manufacturer |
Vacuum gauge | INFICON(Germany)/Leybold (Germany)/ULVAC(JAPAN) |
Pressure ball valve | TYCO(USA)/KITZ(JAPAN) |
PLC | SIEMENS (Germany) |
Temperature control instrument | CHINO /SHIMADEN(Japan) |
Thermocouple | NANMAC(USA) |
Pneumatic cylinder | FESTO (Germany)/SMC (Japan) |
Dry Screw Vacuum Pump | Leybold (Germany)/ULVAC(JAPAN)/China |
Mechanical Booster Pump | Leybold (Germany)/ULVAC(JAPAN)/China |
High Pressure Gauge | WIKA (Japan) |
Insulator | SGL(Germany)/China/Tokai |
Heater | SGL(Germany)/Tokai |
Delivery time: 2 to 6 months depends on the model and the final detail configuration confirmed by customer.
Assemble: We will despatch one or two engineers to your site to help assemble, test and adjust the sintering furnace systems.
Warranty: 1 year warranty, all problems will be fixed for free in case correct operation, after one year, the maintenance will last for lifetime long with components charged.
New Year First day workshop after cleaning picture: